Identification of Human Resource Planning Factors in In-house Construction Management (Owner-Managed Construction) Affecting the Time Performance of Hotel Development Projects
DOI:
https://doi.org/10.38035/gijes.v4i2.1118Keywords:
In-house Construction Management, Owner-Managed Construction, Human Resource Planning, Project Time Performance, Hotel Construction ProjectAbstract
In projects implementing an In-house Construction Management (CM) system, the effectiveness of human resource (HR) planning is a critical aspect in supporting the achievement of project time targets, particularly in projects whose Owners lack a construction-related background. This condition is commonly found in Hotel Development Projects, as the Owner's core business is neither in the construction sector nor in hotel operations. Therefore, this study aims to analyze the HR planning factors of In-house CM in owner-managed construction with limited project management background, and to examine their influence on project time performance. The study employs a descriptive quantitative approach using a case study method. Data were obtained through a literature review, expert validation to determine the level of influence of indicators on time performance, and the distribution of questionnaires to project respondents to identify the existing conditions. Data analysis was conducted using the Relative Importance Index (RII) method, mean score, and the Spearman correlation test. The RII results identified 12 indicators categorized as "Very High" in importance, which were subsequently tested for their correlation with project time performance. The results indicate that HR mobilization time planning and the establishment of team coordination relationships have the strongest correlation (categorized as "Strong"), thus becoming the priority indicators in efforts to improve the time performance of Hotel Development Projects.
References
Alaghbari, W., Kadir, MRA, Salim, A., & Ernawati. (2007). The significant factors causing delays of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192–206.
Assaf, S.A., & Al-Hejji, S. (2006). Causes of delays in large construction projects. International Journal of Project Management, 24(4), 349–357.
Bahr, M., & Laszig, L. (2021). Productivity Development in the Construction Industry and Human Capital: A Literature Review. Working Paper/Literature Review.
Belout, A., & Gauvreau, C. (2004). Factors influencing project success: The impact of human resource management. International Journal of Project Management, 22(1), 1–11. doi:10.1016/S0263-7863(03)00003-6.
Chan, D. W. M., & Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), 55–63. doi:10.1016/S0263-7863(96)00039-7.
Dainty, A. R. J., Cheng, M. I., & Moore, D. R. (2004). A competency-based performance model for construction project managers. Construction Management and Economics, 22(8), 877–886. doi:10.1080/0144619042000202726.
Doloi, H. (2013). Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 139(3), 267–279.
Doloi, H., Sawhney, A., Iyer, K.C., & Rentala, S. (2012). Analyzing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479–489.
Durdyev, S., & Mbachu, J. (2011). On-site labor productivity of New Zealand construction industry: Key constraints and improvement measures. Australasian Journal of Construction Economics and Building, 11(3), 18–33. doi:10.5130/AJCEB.v11i3.2120.
Kazaz, A., Manisali, E., & Ulubeyli, S. (2008). Effect of basic motivational factors on construction workforce productivity in Turkey. Journal of Civil Engineering and Management, 14(2), 95–106. doi:10.3846/1392-3730.2008.14.4.
Kerzner, H. (2022). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (13th ed.). Wiley.
Loosemore, M., Dainty, A., & Lingard, H. (Eds.). (2020). Human Resource Management in Construction Projects: Strategic and Operational Approaches. Routledge.
Love, P.E.D., Edwards, D.J., Watson, H., & Davis, P.R. (2010). Rework in civil infrastructure projects: Determination of cost predictors. Journal of Construction Engineering and Management, 136(3), 275–282.
Project Management Institute. (2017). A Guide to the Project Management Body of Knowledge (PMBOK Guide). 6th ed. Project Management Institute.
Project Management Institute. (2021). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) (7th ed.). Project Management Institute.
Sugiyono. (2017). Statistics for research. Alphabet
Too, E. G., & Weaver, P. (2014). The management of project management: A conceptual framework for project governance. International Journal of Project Management, 32(8), 1382–1394.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Rahma Ghaesani Subagja, Rully Andhika Karim

This work is licensed under a Creative Commons Attribution 4.0 International License.
Copyright:
Authors who publish their manuscripts in this journal agree to the following conditions:
- Copyright in each article belongs to the author.
- The author acknowledges that Greenation International Journal of Engineering Science (GIJES) has the right to be the first to publish under a Creative Commons Attribution 4.0 International license (Attribution 4.0 International CC BY 4.0).
- Authors can submit articles separately, arrange the distribution of non-exclusive manuscripts that have been published in this journal to other versions (for example, sent to the author's institutional repository, publication in books, etc.), acknowledging that the manuscript has been published for the first time in GIJES.