Optimization of Time and Cost For Work Barge Repair Project Using Crashing Method With Trade-Off Cost At Pt Pasifik Karyasindo Perkasa
DOI:
https://doi.org/10.38035/gijes.v4i3.1318Keywords:
Critical Path Method, PERT, Crashing, Time-Cost Trade-Off, Ship Repair, OvertimeAbstract
Ship repair projects are characterized by complex activities, interdependent work processes, and strict completion schedules. Delays in ship repair projects may result in increased operational costs, additional labor costs, and disruptions to the vessel's operational schedule. Therefore, an appropriate scheduling method is required to identify critical activities and determine efficient acceleration alternatives from both time and cost perspectives. This study aims to optimize the time and cost of a Work Barge repair project at PT Pasifik Karyasindo Perkasa by applying the Critical Path Method (CPM), Program Evaluation and Review Technique (PERT), and the crashing method using the Time-Cost Trade-Off approach. The study focuses on accelerating the repair project through additional working hours or overtime without causing disproportionate increases in the project budget. CPM is applied to determine the project network, project duration, and critical activities, while PERT is used to estimate the expected project duration based on optimistic, most likely, and pessimistic time estimates and to determine the probability of project completion. Furthermore, crashing analysis is conducted by comparing normal and crash durations as well as normal and additional overtime costs. The efficiency of each acceleration alternative is determined based on the additional cost required for each unit of time reduction using the cost slope approach. The final analysis is intended to identify the optimal combination of project duration and cost, enabling project acceleration while maintaining cost efficiency and avoiding excessive budget increases.
References
Amrullah, M. F. K., Budiarto, U., & Zakki, A. F. (2023). Penjadwalan proyek reparasi kapal Tugboat Selat Legundi II–206 dengan metode Time Cost Trade-Off (TCTO) dan Project Evaluation and Review Technique (PERT). Jurnal Teknik Perkapalan, 11(1), 105–115.
Asfala, D., Mulyatno, I. P., & Manik, P. (2024). Optimasi reschedule reparasi kapal KMP Tribuana 1 dan MT Bulue Star 5 menggunakan metode Time Cost Trade Off dengan 8 variasi crashing berbasis CPM. Jurnal Teknik Perkapalan, 12(1).
Jariah, A., & Sade, J. (2026). Comparative analysis of CPM and PERT methods for scheduling the repair process of KMP. Kormomolin. Zona Laut: Jurnal Inovasi Sains dan Teknologi Kelautan.
Manik, P., Afrodiyanti, R., & Hakim, M. L. (2025). Study of rescheduling of MV Alfa Trans Satu ship repair using Critical Path Method (CPM) and Project Evaluation and Review Technique (PERT). International Journal of Marine Engineering Innovation and Research, 8(4). https://doi.org/10.12962/j25481479.v8i4
Mulyatno, I. P., Humaida, H. N., Amiruddin, W., Adietya, B. A., & Yudo, H. (2025). Application of Time Cost Trade Off Method in optimizing time and cost on ship refurbishment projects KMP Dharma Rucitra 1 and MT Triaksa 17. International Journal of Marine Engineering Innovation and Research, 9(4), 817–824. https://doi.org/10.12962/j25481479.v9i4
Prabani, S. A. K., Mulyatno, I. P., & Chrismianto, D. (2021). Analisa crashing project menggunakan metode Time Cost Trade Off pada pembangunan Mooring Boat milik PT Pertamina Trans Kontinental akibat modifikasi desain bottom keel. Jurnal Teknik Perkapalan, 9(3).
Sadewo, F. P. U., Amiruddin, W., & Kiryanto. (2022). Optimasi percepatan pada proyek reparasi KM Fajar Bahari V dengan menggunakan metode Time Cost Trade Off. Jurnal Teknik Perkapalan, 10(2), 77–84.
Santosa, A. W. B., et al. (2024). Analysis of the application of Time Cost Trade-Off method on Tug Boat 135 GT repair projects owned by PT Pelabuhan Indonesia II. TEKNIK, 45(1), 146–152. https://doi.org/10.14710/teknik.v45i1.52415
Setiawan, I., Siboro, I., & Faisal, M. (2022). Optimasi waktu dan biaya proyek menggunakan metode Time Cost Trade Off (TCTO). Jurnal Ilmiah Teknik Sipil TRANSUKMA, 3(2). https://doi.org/10.36277/transukma.v3i2.80
Syahada, K. N., Rindo, G., Santosa, A. W. B., & Prasetyo, N. A. (2025). Analisis reschedule keterlambatan proyek reparasi dua kapal dengan metode Critical Path Method (CPM) dan Time Cost Trade Off (TCTO) pada KM. Kendhaga Nusantara 4 dan TB. Sorowako Star. Jurnal Integrasi, 16(2). https://doi.org/10.30871/ji.v16i2.8451
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jeff wilson Andrian Bao, Eko Hadi Saputro, Edi Sumarya

This work is licensed under a Creative Commons Attribution 4.0 International License.
Copyright:
Authors who publish their manuscripts in this journal agree to the following conditions:
- Copyright in each article belongs to the author.
- The author acknowledges that Greenation International Journal of Engineering Science (GIJES) has the right to be the first to publish under a Creative Commons Attribution 4.0 International license (Attribution 4.0 International CC BY 4.0).
- Authors can submit articles separately, arrange the distribution of non-exclusive manuscripts that have been published in this journal to other versions (for example, sent to the author's institutional repository, publication in books, etc.), acknowledging that the manuscript has been published for the first time in GIJES.
























