[1]
Prasetya Yoanda, B. and Abdullah, R. 2023. Analysis Capacity And Cost Tool Heavy To Production Work (Study Case : Building Construction New SMAN 2 Bukittinggi). Greenation International Journal of Engineering Science. 1, 1 (Mar. 2023), 32–39. DOI:https://doi.org/10.38035/gijes.v1i1.5.